Bulk Carrier
176,000 DWT
Period :
14 days
Place :
Korea
Completion :
2020.06.03
Vessel Details
Year of Built 2005 Class KR Flag Marshall Is
Specification for Scrubber
Main Engine
  • CR : 16,800kW
  • Design load for Scrubber : 85% (14,280kw)
  • Gas flow at design load : 146,822kg/h
Auxiliary Engine
  • CR : 560kW
  • Design load for Scrubber : 85% (476kw)
  • Gas flow at design load : 3,570kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 153,962kg/h
Time Table
Vessel berthed at Sungdong shipyard (Tongyeong)
  • 21 May 2020
Work Start
  • 21 May 2020
Work Complete (Including seatrial)
  • 03 June 2020