Tanker
318,000 DWT
Period :
14 days
Place :
Korea
Completion :
2019.12.12
Vessel Details
Year of Built 2013 Class LR Flag Liberia
Specification for Scrubber
Main Engine
  • CR : 30,423 kW
  • Design load for Scrubber : 75% (22,817 kW)
  • Gas flow at design load : 210,756 kg/h
Auxiliary Engine
  • CR : 1,277 kW
  • Design load for Scrubber : 85% (1,085 kW)
  • Gas flow at design load : 8,640 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 228,036 kg/h
Time Table
Vessel berthed at Sungdong shipyard (Tongyeong)
  • 28 November 2019
Work Start
  • 28 November 2019
Work Complete (Including seatrial)
  • 12 December 2019