Tanker
160,000 DWT
Period :
13 days
Place :
Korea
Completion :
2019.12.20
Vessel Details
Year of Built 2012 Class DNV.GL Flag Liberia
Specification for Scrubber
Main Engine
  • CR : 19,620 kW
  • Design load for Scrubber : 75% (14,715 kW)
  • Gas flow at design load : 131,700 kg/h
Auxiliary Engine
  • CR : 960 kW
  • Design load for Scrubber : 85% (816 kW)
  • Gas flow at design load : 6,215 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 144,130 kg/h
Time Table
Vessel berthed at Sungdong shipyard (Tongyeong)
  • 08 December 2019
Work Start
  • 08 December 2019
Work Complete (Including seatrial)
  • 20 December 2019