Tanker
158,000 DWT
Period :
5 days (with pre-installation)
Place :
Korea
Completion :
2018.12.30
Vessel Details
Year of Built 2017 Class LR Flag Marshall Is
Specification for Scrubber
Main Engine
  • CR : 10,818 kW
  • Design load for Scrubber : 71.7% (7,680 kW)
  • Gas flow at design load : 92,290 kg/h
Auxiliary Engine
  • CR : 1,050 kW
  • Design load for Scrubber : 90% (945 kW)
  • Gas flow at design load : 7,470 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 107,230 kg/h
Time Table
Equipment Loading at Singapore
  • 26 November 2018
Vessel berthed at Sungdong shipyard (Tongyeong)
  • 05 December 2018
Work Start
  • 05 December 2018
Work Complete (Including seatrial)
  • 10 December 2018