Tanker
115,000 DWT
Period :
14 days
Place :
Turkey
Completion :
2019.06.15
Vessel Details
Year of Built 2009 Class DNV.GL Flag Liberia
Specification for Scrubber
Main Engine
  • CR : 13,730 kW
  • Design load for Scrubber : 85% (11,670 kW)
  • Gas flow at design load : 106,250 kg/h
Auxiliary Engine
  • CR : 880 kW
  • Design load for Scrubber : 85% (748 kW)
  • Gas flow at design load : 6,333 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 118,915 kg/h
Time Table
Vessel berthed at Tuzla shipyard
  • 08 May 2019
Work Start
  • 15 May 2019
Work Complete (Including seatrial)
  • 18 June 2019