Bulk Carrier
63,000 DWT
Period :
Newbuilding
Place :
China
Completion :
2023.11.24
Vessel Details
Year of Built 2024 Class BV Flag Marshall Is [MH]
Specification for Scrubber
Main Engine
  • CR : 5,460 kW
  • Design load for Scrubber : 100% (5,460 kW)
  • Gas flow at design load : 44,712 kg/h
Auxiliary Engine
  • CR : 800 kW
  • Design load for Scrubber : 80% (640 kW)
  • Gas flow at design load : 4,640 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 53,992 kg/h
Time Table